Projects
Project Portfolio
Curated highlights across water, energy, and industrial markets.
Municipal Water Treatment Expansion
EPC delivery · 40 MGD capacity
PFAS Treatment Facility
Constituent removal · phys-chem process
Power Plant Outage & Scrubber Upgrade
Boilermaker · outage shutdown
Industrial Pipe Rack & Mechanical
Structural steel · mechanical piping
Wastewater CSO Storage Tunnel
Deep excavation · concrete structures
Utility Boiler Conversion
Fuel/burner conversion · tie-ins
CCR Pond Closure
Landfill closure · environmental compliance
Treatment Plant Headworks
Design-build · active facility
Absorber & DSI Installation
Air quality systems · outage work
Industrial Tank Farm
Structural concrete · piping
ELG Compliance Upgrade
Environmental compliance · EPC
Precipitator Replacement
Boilermaker · outage
Case Studies
Regional PFAS Treatment Facility
Municipal client needed PFAS constituent removal within an active treatment campus on an accelerated schedule.
Bowen self-performed civil, mechanical, and boilermaker scope with phased work in an operating facility.
Delivered on schedule with zero recordable injuries and integrated phys-chem process trains.
Power Station Outage & Scrubber Retrofit
Utility required outage work with tight turnaround and multi-discipline self-perform coordination.
Direct-hire boilermaker and mechanical crews executed tie-ins, ductwork, and absorber modifications.
Completed outage window on budget with real-time schedule reporting through Bowen project controls.
Industrial Environmental Remediation
Industrial owner needed pond closure and compliance upgrades without disrupting plant operations.
Site, civil, and structural self-perform teams phased excavation, liner, and closure work.
Achieved compliance milestones with transparent cost tracking via target-price alliance delivery.