Custom website concept by Cantu for Bowen Engineering

$1,000 once · 12 pages · PFAS · 3 case studies · multi-step intake · full GEO · no monthly fee

BOWEN

Projects

Project Portfolio

Curated highlights across water, energy, and industrial markets.

Water / Wastewater

Municipal Water Treatment Expansion

EPC delivery · 40 MGD capacity

Water / Wastewater

PFAS Treatment Facility

Constituent removal · phys-chem process

Energy

Power Plant Outage & Scrubber Upgrade

Boilermaker · outage shutdown

Industrial

Industrial Pipe Rack & Mechanical

Structural steel · mechanical piping

Water / Wastewater

Wastewater CSO Storage Tunnel

Deep excavation · concrete structures

Energy

Utility Boiler Conversion

Fuel/burner conversion · tie-ins

Industrial

CCR Pond Closure

Landfill closure · environmental compliance

Water / Wastewater

Treatment Plant Headworks

Design-build · active facility

Energy

Absorber & DSI Installation

Air quality systems · outage work

Industrial

Industrial Tank Farm

Structural concrete · piping

Water / Wastewater

ELG Compliance Upgrade

Environmental compliance · EPC

Energy

Precipitator Replacement

Boilermaker · outage

Case Studies

Water / Wastewater

Regional PFAS Treatment Facility

Challenge

Municipal client needed PFAS constituent removal within an active treatment campus on an accelerated schedule.

Approach

Bowen self-performed civil, mechanical, and boilermaker scope with phased work in an operating facility.

Results

Delivered on schedule with zero recordable injuries and integrated phys-chem process trains.

Energy

Power Station Outage & Scrubber Retrofit

Challenge

Utility required outage work with tight turnaround and multi-discipline self-perform coordination.

Approach

Direct-hire boilermaker and mechanical crews executed tie-ins, ductwork, and absorber modifications.

Results

Completed outage window on budget with real-time schedule reporting through Bowen project controls.

Industrial

Industrial Environmental Remediation

Challenge

Industrial owner needed pond closure and compliance upgrades without disrupting plant operations.

Approach

Site, civil, and structural self-perform teams phased excavation, liner, and closure work.

Results

Achieved compliance milestones with transparent cost tracking via target-price alliance delivery.